Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.9%
OF COST SPENT
₹38.11 L spent
of ₹42.20 Cr sanctioned
₹41.82 Cr still to spend
on 340 ongoing works
Works ongoing
340
Open the list of these works →
Sanctioned
₹42.20 Cr
Pure scheme (wage + material)
Expenditure since inception
₹38.11 L
0.9% of sanction
Balance cost (unspent)
₹41.82 Cr
Wage₹16.33 Cr
Material₹25.49 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore