Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Compound wall
0.5%
OF COST SPENT
₹3.41 L spent
of ₹7.17 Cr sanctioned
₹7.14 Cr still to spend
on 99 ongoing works
Works ongoing
99
Open the list of these works →
Sanctioned
₹7.17 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.41 L
0.5% of sanction
Balance cost (unspent)
₹7.14 Cr
Wage₹1.82 Cr
Material₹5.32 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore