Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
20%
OF COST SPENT
₹2.13 Cr spent
of ₹10.63 Cr sanctioned
₹8.50 Cr still to spend
on 485 ongoing works
Works ongoing
485
Open the list of these works →
Sanctioned
₹10.63 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.13 Cr
20% of sanction
Balance cost (unspent)
₹8.50 Cr
Wage₹6.26 Cr
Material₹2.24 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore