Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
53.7%
OF COST SPENT
₹7.70 Cr spent
of ₹14.34 Cr sanctioned
₹6.64 Cr still to spend
on 126 ongoing works
Works ongoing
126
Open the list of these works →
Sanctioned
₹14.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.70 Cr
53.7% of sanction
Balance cost (unspent)
₹6.64 Cr
Wage₹2.51 Cr
Material₹4.14 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore