Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
79.1%
OF COST SPENT
₹15.70 Cr spent
of ₹19.85 Cr sanctioned
₹4.16 Cr still to spend
on 142 ongoing works
Works ongoing
142
Open the list of these works →
Sanctioned
₹19.85 Cr
Pure scheme (wage + material)
Expenditure since inception
₹15.70 Cr
79.1% of sanction
Balance cost (unspent)
₹4.16 Cr
Wage₹1.87 Cr
Material₹2.29 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore