Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
65.4%
OF COST SPENT
₹1.78 Cr spent
of ₹2.72 Cr sanctioned
₹93.96 L still to spend
on 233 ongoing works
Works ongoing
233
Open the list of these works →
Sanctioned
₹2.72 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.78 Cr
65.4% of sanction
Balance cost (unspent)
₹93.96 L
Wage₹78.09 L
Material₹15.88 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore