Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
17.7%
OF COST SPENT
₹31.22 L spent
of ₹1.76 Cr sanctioned
₹1.45 Cr still to spend
on 20 ongoing works
Works ongoing
20
Open the list of these works →
Sanctioned
₹1.76 Cr
Pure scheme (wage + material)
Expenditure since inception
₹31.22 L
17.7% of sanction
Balance cost (unspent)
₹1.45 Cr
Wage₹79.28 L
Material₹65.75 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore