Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGPlantation
2.5%
OF COST SPENT
₹39.91 L spent
of ₹15.66 Cr sanctioned
₹15.26 Cr still to spend
on 695 ongoing works
Works ongoing
695
Open the list of these works →
Sanctioned
₹15.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹39.91 L
2.5% of sanction
Balance cost (unspent)
₹15.26 Cr
Wage₹8.87 Cr
Material₹6.39 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block