Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
31%
OF COST SPENT
₹76.19 L spent
of ₹2.46 Cr sanctioned
₹1.69 Cr still to spend
on 48 ongoing works
Works ongoing
48
Open the list of these works →
Sanctioned
₹2.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹76.19 L
31% of sanction
Balance cost (unspent)
₹1.69 Cr
Wage₹70.92 L
Material₹98.52 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore