Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
4.4%
OF COST SPENT
₹70.48 L spent
of ₹15.90 Cr sanctioned
₹15.19 Cr still to spend
on 311 ongoing works
Works ongoing
311
Open the list of these works →
Sanctioned
₹15.90 Cr
Pure scheme (wage + material)
Expenditure since inception
₹70.48 L
4.4% of sanction
Balance cost (unspent)
₹15.19 Cr
Wage₹5.04 Cr
Material₹10.15 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore