Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
33.5%
OF COST SPENT
₹96.35 L spent
of ₹2.88 Cr sanctioned
₹1.92 Cr still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹2.88 Cr
Pure scheme (wage + material)
Expenditure since inception
₹96.35 L
33.5% of sanction
Balance cost (unspent)
₹1.92 Cr
Wage₹85.84 L
Material₹1.06 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore