Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
74.4%
OF COST SPENT
₹12.60 Cr spent
of ₹16.95 Cr sanctioned
₹4.35 Cr still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹16.95 Cr
Pure scheme (wage + material)
Expenditure since inception
₹12.60 Cr
74.4% of sanction
Balance cost (unspent)
₹4.35 Cr
Wage₹1.35 Cr
Material₹3.00 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore