Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.8%
OF COST SPENT
₹17.01 L spent
of ₹21.15 Cr sanctioned
₹20.98 Cr still to spend
on 667 ongoing works
Works ongoing
667
Open the list of these works →
Sanctioned
₹21.15 Cr
Pure scheme (wage + material)
Expenditure since inception
₹17.01 L
0.8% of sanction
Balance cost (unspent)
₹20.98 Cr
Wage₹9.29 Cr
Material₹11.68 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore