Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
36.1%
OF COST SPENT
₹2.95 L spent
of ₹8.18 L sanctioned
₹5.23 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹8.18 L
Pure scheme (wage + material)
Expenditure since inception
₹2.95 L
36.1% of sanction
Balance cost (unspent)
₹5.23 L
Wage₹2.60 L
Material₹2.62 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh