Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
19.2%
OF COST SPENT
₹1.19 Cr spent
of ₹6.17 Cr sanctioned
₹4.98 Cr still to spend
on 151 ongoing works
Works ongoing
151
Open the list of these works →
Sanctioned
₹6.17 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.19 Cr
19.2% of sanction
Balance cost (unspent)
₹4.98 Cr
Wage₹4.16 Cr
Material₹82.03 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore