Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
67.2%
OF COST SPENT
₹42.35 Cr spent
of ₹63.05 Cr sanctioned
₹20.69 Cr still to spend
on 199 ongoing works
Works ongoing
199
Open the list of these works →
Sanctioned
₹63.05 Cr
Pure scheme (wage + material)
Expenditure since inception
₹42.35 Cr
67.2% of sanction
Balance cost (unspent)
₹20.69 Cr
Wage₹6.76 Cr
Material₹13.93 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore