Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
48.2%
OF COST SPENT
₹3.16 Cr spent
of ₹6.56 Cr sanctioned
₹3.40 Cr still to spend
on 98 ongoing works
Works ongoing
98
Open the list of these works →
Sanctioned
₹6.56 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.16 Cr
48.2% of sanction
Balance cost (unspent)
₹3.40 Cr
Wage₹1.90 Cr
Material₹1.50 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore