Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1.6%
OF COST SPENT
₹10.99 L spent
of ₹6.72 Cr sanctioned
₹6.61 Cr still to spend
on 116 ongoing works
Works ongoing
116
Open the list of these works →
Sanctioned
₹6.72 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.99 L
1.6% of sanction
Balance cost (unspent)
₹6.61 Cr
Wage₹3.35 Cr
Material₹3.26 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0