Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Canal
69%
OF COST SPENT
₹1.33 Cr spent
of ₹1.93 Cr sanctioned
₹59.72 L still to spend
on 33 ongoing works
Works ongoing
33
Open the list of these works →
Sanctioned
₹1.93 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.33 Cr
69% of sanction
Balance cost (unspent)
₹59.72 L
Wage₹15.59 L
Material₹44.13 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh