Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGPlantation
30.3%
OF COST SPENT
₹6.38 Cr spent
of ₹21.03 Cr sanctioned
₹14.65 Cr still to spend
on 870 ongoing works
Works ongoing
870
Open the list of these works →
Sanctioned
₹21.03 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.38 Cr
30.3% of sanction
Balance cost (unspent)
₹14.65 Cr
Wage₹7.24 Cr
Material₹7.41 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block