Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.2%
OF COST SPENT
₹2.31 L spent
of ₹12.07 Cr sanctioned
₹12.05 Cr still to spend
on 83 ongoing works
Works ongoing
83
Open the list of these works →
Sanctioned
₹12.07 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.31 L
0.2% of sanction
Balance cost (unspent)
₹12.05 Cr
Wage₹7.26 Cr
Material₹4.79 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore