Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
2.1%
OF COST SPENT
₹5.96 L spent
of ₹2.89 Cr sanctioned
₹2.83 Cr still to spend
on 96 ongoing works
Works ongoing
96
Open the list of these works →
Sanctioned
₹2.89 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.96 L
2.1% of sanction
Balance cost (unspent)
₹2.83 Cr
Wage₹2.17 Cr
Material₹65.61 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr