Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
7.4%
OF COST SPENT
₹15,360 spent
of ₹2.07 L sanctioned
₹1.92 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹2.07 L
Pure scheme (wage + material)
Expenditure since inception
₹15,360
7.4% of sanction
Balance cost (unspent)
₹1.92 L
Wage₹92,070
Material₹99,955