Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
29.8%
OF COST SPENT
₹51.14 L spent
of ₹1.71 Cr sanctioned
₹1.20 Cr still to spend
on 96 ongoing works
Works ongoing
96
Open the list of these works →
Sanctioned
₹1.71 Cr
Pure scheme (wage + material)
Expenditure since inception
₹51.14 L
29.8% of sanction
Balance cost (unspent)
₹1.20 Cr
Wage₹85.44 L
Material₹34.82 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh