Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
0.3%
OF COST SPENT
₹22,800 spent
of ₹77.09 L sanctioned
₹76.87 L still to spend
on 38 ongoing works
Works ongoing
38
Open the list of these works →
Sanctioned
₹77.09 L
Pure scheme (wage + material)
Expenditure since inception
₹22,800
0.3% of sanction
Balance cost (unspent)
₹76.87 L
Wage₹52.66 L
Material₹24.20 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh