Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
18%
OF COST SPENT
₹52.54 L spent
of ₹2.92 Cr sanctioned
₹2.40 Cr still to spend
on 125 ongoing works
Works ongoing
125
Open the list of these works →
Sanctioned
₹2.92 Cr
Pure scheme (wage + material)
Expenditure since inception
₹52.54 L
18% of sanction
Balance cost (unspent)
₹2.40 Cr
Wage₹1.75 Cr
Material₹64.48 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore