Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
47.5%
OF COST SPENT
₹10.03 Cr spent
of ₹21.10 Cr sanctioned
₹11.07 Cr still to spend
on 845 ongoing works
Works ongoing
845
Open the list of these works →
Sanctioned
₹21.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.03 Cr
47.5% of sanction
Balance cost (unspent)
₹11.07 Cr
Wage₹2.24 Cr
Material₹8.83 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore