Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
46.5%
OF COST SPENT
₹67.18 L spent
of ₹1.44 Cr sanctioned
₹77.28 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹1.44 Cr
Pure scheme (wage + material)
Expenditure since inception
₹67.18 L
46.5% of sanction
Balance cost (unspent)
₹77.28 L
Wage₹43.39 L
Material₹33.89 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh