Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
2.8%
OF COST SPENT
₹56,400 spent
of ₹20.15 L sanctioned
₹19.59 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹20.15 L
Pure scheme (wage + material)
Expenditure since inception
₹56,400
2.8% of sanction
Balance cost (unspent)
₹19.59 L
Wage₹11.81 L
Material₹7.78 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh