Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
52.5%
OF COST SPENT
₹7.29 Cr spent
of ₹13.88 Cr sanctioned
₹6.59 Cr still to spend
on 121 ongoing works
Works ongoing
121
Open the list of these works →
Sanctioned
₹13.88 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.29 Cr
52.5% of sanction
Balance cost (unspent)
₹6.59 Cr
Wage₹1.00 Cr
Material₹5.58 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore