Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
0.1%
OF COST SPENT
₹58,200 spent
of ₹9.39 Cr sanctioned
₹9.38 Cr still to spend
on 303 ongoing works
Works ongoing
303
Open the list of these works →
Sanctioned
₹9.39 Cr
Pure scheme (wage + material)
Expenditure since inception
₹58,200
0.1% of sanction
Balance cost (unspent)
₹9.38 Cr
Wage₹7.86 Cr
Material₹1.52 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore