Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
40.9%
OF COST SPENT
₹1.02 L spent
of ₹2.49 L sanctioned
₹1.47 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹2.49 L
Pure scheme (wage + material)
Expenditure since inception
₹1.02 L
40.9% of sanction
Balance cost (unspent)
₹1.47 L
Wage₹1.47 L
Material₹0
Trend

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh