Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Percolation Tank
7.2%
OF COST SPENT
₹1.04 L spent
of ₹14.51 L sanctioned
₹13.47 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹14.51 L
Pure scheme (wage + material)
Expenditure since inception
₹1.04 L
7.2% of sanction
Balance cost (unspent)
₹13.47 L
Wage₹8.33 L
Material₹5.13 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹43,128
Top 10 new work types

Ranked by sanctioned cost