Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
1.1%
OF COST SPENT
₹5.11 L spent
of ₹4.47 Cr sanctioned
₹4.42 Cr still to spend
on 175 ongoing works
Works ongoing
175
Open the list of these works →
Sanctioned
₹4.47 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.11 L
1.1% of sanction
Balance cost (unspent)
₹4.42 Cr
Wage₹3.55 Cr
Material₹86.74 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore