Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
2.1%
OF COST SPENT
₹4.69 L spent
of ₹2.21 Cr sanctioned
₹2.16 Cr still to spend
on 180 ongoing works
Works ongoing
180
Open the list of these works →
Sanctioned
₹2.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.69 L
2.1% of sanction
Balance cost (unspent)
₹2.16 Cr
Wage₹1.68 Cr
Material₹48.58 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh