Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
45.6%
OF COST SPENT
₹4.59 Cr spent
of ₹10.06 Cr sanctioned
₹5.47 Cr still to spend
on 277 ongoing works
Works ongoing
277
Open the list of these works →
Sanctioned
₹10.06 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.59 Cr
45.6% of sanction
Balance cost (unspent)
₹5.47 Cr
Wage₹3.84 Cr
Material₹1.63 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost