Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
67.9%
OF COST SPENT
₹28.60 Cr spent
of ₹42.15 Cr sanctioned
₹13.54 Cr still to spend
on 340 ongoing works
Works ongoing
340
Open the list of these works →
Sanctioned
₹42.15 Cr
Pure scheme (wage + material)
Expenditure since inception
₹28.60 Cr
67.9% of sanction
Balance cost (unspent)
₹13.54 Cr
Wage₹8.70 Cr
Material₹4.85 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr