Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGBoulder Check/Gully Plug
0.5%
OF COST SPENT
₹3,600 spent
of ₹7.38 L sanctioned
₹7.35 L still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹7.38 L
Pure scheme (wage + material)
Expenditure since inception
₹3,600
0.5% of sanction
Balance cost (unspent)
₹7.35 L
Wage₹3.13 L
Material₹4.22 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh