Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Canal
0.6%
OF COST SPENT
₹6.45 L spent
of ₹10.15 Cr sanctioned
₹10.08 Cr still to spend
on 170 ongoing works
Works ongoing
170
Open the list of these works →
Sanctioned
₹10.15 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.45 L
0.6% of sanction
Balance cost (unspent)
₹10.08 Cr
Wage₹5.27 Cr
Material₹4.81 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost