Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
33.8%
OF COST SPENT
₹2.53 Cr spent
of ₹7.49 Cr sanctioned
₹4.96 Cr still to spend
on 128 ongoing works
Works ongoing
128
Open the list of these works →
Sanctioned
₹7.49 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.53 Cr
33.8% of sanction
Balance cost (unspent)
₹4.96 Cr
Wage₹2.44 Cr
Material₹2.52 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore