Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
47%
OF COST SPENT
₹1.45 Cr spent
of ₹3.08 Cr sanctioned
₹1.63 Cr still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹3.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.45 Cr
47% of sanction
Balance cost (unspent)
₹1.63 Cr
Wage₹65.56 L
Material₹97.88 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore