Data as of 29 Oct 2026, 07:04 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWorks for Flood Control and Protection
3.2%
OF COST SPENT
₹5,790 spent
of ₹1.82 L sanctioned
₹1.76 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹1.82 L
Pure scheme (wage + material)
Expenditure since inception
₹5,790
3.2% of sanction
Balance cost (unspent)
₹1.76 L
Wage₹1.03 L
Material₹73,000
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh