Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
38.1%
OF COST SPENT
₹8.98 Cr spent
of ₹23.60 Cr sanctioned
₹14.62 Cr still to spend
on 854 ongoing works
Works ongoing
854
Open the list of these works →
Sanctioned
₹23.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.98 Cr
38.1% of sanction
Balance cost (unspent)
₹14.62 Cr
Wage₹4.61 Cr
Material₹10.01 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore