MGNREGA + VBGRAMGTerracing
21.7%
OF COST SPENT
₹2.75 L spent
of ₹12.63 L sanctioned
₹9.89 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹12.63 L
Pure scheme (wage + material)
Expenditure since inception
₹2.75 L
21.7% of sanction
Balance cost (unspent)
₹9.89 L
Wage₹6.77 L
Material₹3.12 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr