Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
78.7%
OF COST SPENT
₹36.04 L spent
of ₹45.78 L sanctioned
₹9.73 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹45.78 L
Pure scheme (wage + material)
Expenditure since inception
₹36.04 L
78.7% of sanction
Balance cost (unspent)
₹9.73 L
Wage₹7.38 L
Material₹2.36 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh