Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
37.9%
OF COST SPENT
₹3.41 Cr spent
of ₹8.99 Cr sanctioned
₹5.58 Cr still to spend
on 341 ongoing works
Works ongoing
341
Open the list of these works →
Sanctioned
₹8.99 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.41 Cr
37.9% of sanction
Balance cost (unspent)
₹5.58 Cr
Wage₹1.98 Cr
Material₹3.60 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore