VBGRAMGConstruction of Tank
0.4%
OF COST SPENT
₹1.11 L spent
of ₹3.05 Cr sanctioned
₹3.04 Cr still to spend
on 32 ongoing works
Works ongoing
32
Open the list of these works →
Sanctioned
₹3.05 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.11 L
0.4% of sanction
Balance cost (unspent)
₹3.04 Cr
Wage₹2.01 Cr
Material₹1.02 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh