Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
35.3%
OF COST SPENT
₹2.12 Cr spent
of ₹6.00 Cr sanctioned
₹3.88 Cr still to spend
on 276 ongoing works
Works ongoing
276
Open the list of these works →
Sanctioned
₹6.00 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.12 Cr
35.3% of sanction
Balance cost (unspent)
₹3.88 Cr
Wage₹2.80 Cr
Material₹1.08 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost