Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
18.7%
OF COST SPENT
₹14.57 L spent
of ₹77.89 L sanctioned
₹63.32 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹77.89 L
Pure scheme (wage + material)
Expenditure since inception
₹14.57 L
18.7% of sanction
Balance cost (unspent)
₹63.32 L
Wage₹33.37 L
Material₹29.94 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh