Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
47.6%
OF COST SPENT
₹1.06 Cr spent
of ₹2.22 Cr sanctioned
₹1.17 Cr still to spend
on 29 ongoing works
Works ongoing
29
Open the list of these works →
Sanctioned
₹2.22 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.06 Cr
47.6% of sanction
Balance cost (unspent)
₹1.17 Cr
Wage₹28.17 L
Material₹88.33 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh